barn conversion, South Holmwood

The work was carried out over a 12 month period, with regular client meetings to adjust internal layouts and ensure everything was exactly to the clients’ requirements.

The larger oak tie beams were craned into place and the frame put together on top, having been almost entirely assembled off-site. This enabled smooth scheduling and the frame to be erected quickly once the walls were constructed up to plate, which in turn meant the project could be protected from the elements, allowing minimal moisture to enter the fabric and preventing the sun from drying out the oak too quickly. In addition, the ground source heating system was introduced over time to allow a long, gentle drying spell before decoration.