loft conversion, Dorking Deepdene

The relevant part of the roof was stripped,
existing dormer removed and the structure
altered, the load being mainly transferred to a
steel beam that was fitted 5 years earlier during
the main construction.

A GRP balcony and a stainless steel and glass
balustrade system was selected to maximise
the view from inside or out, and aluminium
bespoke doors with shaped side lights were
fabricated to minimise frame and let in the
maximum amount of light.

From start to finish, the work was carried out in
3 weeks.

loft conversion dorking